User Tools

Site Tools


archive:sig:build

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revision Both sides next revision
archive:sig:build [2011/01/23 19:19]
rblack6
archive:sig:build [2011/01/23 20:09]
rblack6
Line 7: Line 7:
    * Systems Administrator - Walter Dworak    * Systems Administrator - Walter Dworak
  
-===== Proposals =====+===== Proposals ​and Purchases ​=====
  
-=== First revision of proposals === +=== Organization proposal === 
-[[http://​acm.cs.uic.edu/​sigbuild/​sigbuild_proposal_100204.pdf]] \\+[[http://​acm.cs.uic.edu/​~rblack6/​sigbuild/​SIGBUILDproposal.pdf]] \\ 
 + 
 +=== Order proposals === 
 +[[http://​acm.cs.uic.edu/~rblack6/​sigbuild/​sigbuild_proposal_100204.pdf]] \\
  
 === Final order list (submitted to CS dept) === === Final order list (submitted to CS dept) ===
-[[http://​acm.cs.uic.edu/​~rblack6/​acm requisition list final.xls]] \\+[[http://​acm.cs.uic.edu/​~rblack6/​sigbuild/​acmsigbuildrequisitionlist.pdf]] \\
  
 ===== Hardware 101 ===== ===== Hardware 101 =====
 === Hardware Guides === === Hardware Guides ===
  
-[[http://​acm.cs.uic.edu/​~rblack6/​SIGBUILDguide.pdf]] \\ +[[http://​acm.cs.uic.edu/​~rblack6/sigbuild/​SIGBUILDguide.pdf]] \\ 
-[[http://​acm.cs.uic.edu/​~rblack6/​SIGBUILDguide1.pdf]]+[[http://​acm.cs.uic.edu/​~rblack6/sigbuild/​SIGBUILDguide1.pdf]]
  
 === Inventory === === Inventory ===
Line 112: Line 115:
 ===== Schedules ===== ===== Schedules =====
  
-==== Robert ==== +
-Here's the link until I get embedding working: http://​tigger.uic.edu/​~rblack6/​work.htm+
  
archive/sig/build.txt · Last modified: 2021/05/02 21:36 (external edit)